Tool 01 · Bushfire

Estimate your BAL.

A planning-stage estimate of Bushfire Attack Level based on AS 3959 Method 1. Vegetation, distance, slope, FDI.

How do I use this calculator?

Work through the fields below in order — vegetation, distance, and slope are the three inputs AS 3959 Method 1 uses to calculate BAL. Tap or hover the i next to any field for a plain-language explanation of what it means and how to measure it.

Inputs

Please input the closest vegetation type to the development, and/or the most heavily vegetated section. If you have multiple vegetation types close to your proposed building site, it is important to measure and input all vegetation types, as they are each calculated differently and will provide different results. The highest vegetation BAL result applies to all aspects of the development.

25 m
Rise m
Run m
5.7°
10.0% grade
Maps to Down 5–10°
Indicative result
BAL 19
Moderate risk. Increasing levels of ember attack and burning debris ignited by windborne embers.
Construction tier
BAL-19
Radiant heat flux
≤ 19 kW/m²
Effective slope
Up / flat
FDI
80
Get a certified assessment →

Copy your results and send them to us when you request a quote, so we know your indicative BAL results.

Disclaimer

Planning-stage estimate only. Compliance with AS 3959-2018 requires a formal assessment by an accredited bushfire practitioner. EcoForm holds FPAA BPAD Level 1–3 accreditation across all classifications.

From estimate to certainty

A full, certified BAL assessment has to be carried out on-site by an accredited bushfire practitioner, no online calculator can replace that. This tool gives you a realistic, fast, free indication so you can budget early, know what questions to ask, and understand whether you're likely looking at a straightforward assessment or a more complex one. Once you have a sense of where you sit, the next step is a site-specific assessment from one of our BPAD-accredited bushfire consultants, backed by full Bushfire Management Plans where subdivisions or larger developments need them.

Frequently asked questions

Is this the same as a certified BAL assessment?

No. This estimator gives a planning-stage indication using AS 3959 Method 1 defaults. A certified assessment requires an accredited practitioner to inspect the site and issue a BAL certificate your certifier and council will accept.

How accurate is the estimate?

It's a solid planning-stage guide based on the same distance, vegetation, and slope inputs used in the Australian Standard, but it can't account for site-specific factors an on-site assessor would identify, like unmapped vegetation or multiple slope changes across a block.

What happens if my site comes back BAL-40 or Flame Zone?

Higher ratings mean stricter construction requirements, not that you can't build. Our bushfire team can advise on performance-based engineering solutions that are sometimes available to reduce cost or unlock a design that a standard approach wouldn't allow.

Who needs to know their BAL rating?

  • Homeowners and owner-builders planning a new home, renovation, or granny flat on land that might be bushfire-prone
  • Buyers considering a block before signing — a surprise BAL-40 rating can turn a dream block into a budget blowout
  • Builders and architects scoping a job and needing an early indication before detailed design
  • Developers assessing feasibility across multiple lots
  • Developers assessing feasibility across multiple lots

    Need a formal report?

    Move from a quick estimate to a certified assessment.